e-Technicians.net(sm)
 
Not an e-Technician? Sign up now.

Why become an e-Technician?


Job Summaries
Browse current opportunities.

About e-Tech Network
Find out all about us.

Who is Rollouts?
Information on the parent co.

FAQs
Answers to many questions.

Testimonials
What the public has been saying.

Contact Us
E-mail, phone, fax, and address.

e-Technicians.net(sm) Login
 
ID:
Password:


Forgot your ID or password?
 
 
 
Welcome to e-Technicians.net(sm)

  Project Summary

Summary of this project, you may view more details if you are an e-Technician:

Project ID: 560
Project Name: Banking Center Systems Installation
States: Florida, Maryland, Virginia
Countries: United States
Start Date: 01/01/2008
End Date: 12/31/2008
Pay: Project Details
Description:
Scope of Work: Equipment Rack Installation. Online Station Installation. Transaction Zone Monitor (TZM) Installation. Media Wall Installation. Speaker Installation Required Tools: • Drill w/ drill index • Hole saw kit • Drywall saw • Zip Tie gun (preferred, not required) • Ratchet Set • Assorted screw drivers • Assorted pliers • Pry Bar/Wonder Bar • Wire strippers • Diagonal cutters • Coax stripper • BNC crimper • RJ45 crimper • F crimper/compression tool • Hex keys (SAE and metric) • Torpedo level • 25’ Tape measure • Multimeter • Network Tester/Toner • Hacksaw • Hammer • Punch Down tool • Flashlight • Fish tape • Utility knife w/ extra blades • Extension cords • Carpenter square (or tri-square) • Reciprocating saw w/ metal and wood blades • Pens/pencils • 6’ ladder * Laptop If you are interested please email Christy Storms at christine.storms@rollouts.com

Back
 
 

© 2010 Rollouts, Inc. Privacy Policy

Rollouts, Inc.